virtual exhibition stand
The virtual exhibition stand is online
A virtual tour as an efficient alternative.
Invite your customers to a virtual tour of their booth.
We create a virtual tour of your booth, including your new products, product information videos and much more.
Follow our example link www.Dr-Hahn.eu/Fensterbau2020
Your virtual exhibition stand can be implemented at short notice.
Please contact us directly on +49 202 37 22 07 10
or by e-mail Thomas.Books@abc-messe.com
Tire Tech - Hannover
Rendering vs. Reality
With us you can assume that we will plan what can be done with you.
You can see for yourself with our example from Tire Tech 2020 in Hanover!
Do you have an idea, inspiration or first drafts for your upcoming booth?
Contact us! We will discuss your options with you and make you a non-binding offer!
E-world energy & water - Essen
11. - 13.02.2020
It doesn't always have to be a new robe to be presented. Sometimes it is enough to equip a booth with fresh graphics and new accessories. This is where the recognition value comes into play. Especially at trade fairs that take place annually.
We are proud to delight our existing customers again and again.
PSI - Düsseldorf
07. - 09.01.2020
[freely quoted from German:]
„For us, the topic of frequency has worked 100 percent. For us, PSI is the industry event. It is an important platform for both the German and the international market. We were delighted with a lot of positive customer feedback and overall we are very satisfied.“ – Meinhard Mombauer , CEO REFLECTS GmbH
Quotation about the PSI fair 2020 , source: https://www.psi-messe.com/de/
Heimtextil - Frankfurt am Main
07. - 10.01.20
Similar but different
What was previously a headstand is now a corner stand.
The mixed construction offers this advantage. KS walls are used for the construction of the rear walls and the cabin. The system profile forms flexible design elements, presentation options and incorporate the spotlights for illuminating the stand. This eliminates the need for a truss and minimizes costs.
The leather and fabric collages created by us were a real eye-catcher in the stand design!
A+A - Düsseldorf
05. - 08.11.2019
New Logo, new layout
Dispensing with the second floor above the cabin makes the stand appear calm and uniform. The staircase that is no longer required, now offers space for advisory spaces that separate the area from the rest of the stand with planted dividing elements.
Tidy and no frills - like our customer's new marketing presence.
K Fair - Düsseldorf
This implementation of the booth at the K-fair was an exciting challenge, which our team mastered with flying colors. We thank all involved for the great cooperation.
Here are a few facts:
10 months planning time
380 m² construction area
8.00 m height wall construction
12,00 m total height graphics
135 m² glass surfaces
862 m² carpenter´s plate
1.264 m² MDF black
1.150 m² painted surfaces
560 l clearcoat
4.000 connection angles
30.000 screws
3000 lfm hard fiber spring
690 m² fabric graphics
3.800 working hours of planning and production
1.640 working hours for construction and dismantling
… and much more
For clarification: The substructures stacked on each other would have been 45.0 m and the grid wall panels 32.2 m.
Motek - Stuttgart
07. - 10.10.2019
#Relaunch
At MOTEK in Stuttgart we were able to accompany the new appearance of our customer Plan B successfully.
The presentation of the individual business areas, architecturally and graphically solved via a partition to the lounge area, as well as the ceiling construction with high distance effect were very popular.
The joint development and implementation of the elaborate robot housing, considering all technical details was a precision landing.